Source: China Water Network
China Water Network News: From October 13th to 14th, the "2011 Sixth China (International) Water Resources and Water Conservancy Development Summit" was jointly organized by the Water Resources Department of the Ministry of Water Resources, the China Water Resources Society, the China Federation of Industry and Commerce Environmental Services Chamber of Commerce, and Shanghai Decision Maker Economic Consulting Co., Ltd. ) Water Affairs Summit Forum was held at the Beijing International Convention Center. The theme of this forum is: Implementing the most stringent water resources management system - opportunities and challenges facing the water market.
In 2011, the CPC Central Committee's "No. 1 Document" focused on water conservancy, which more effectively promoted the implementation of the strictest water resources management system. At the forum, Cheng Xiaobing, deputy director of the Water Resources Department of the Ministry of Water Resources, said that the main goal of implementing the strictest water resources management system is to basically establish a system for the rational allocation and efficient use of water resources by 2020, and strive to control the total annual water consumption in the country to The urban and rural water supply guarantee rate within 670 billion cubic meters has been significantly improved, the drinking water safety of urban and rural residents has been fully guaranteed, the water consumption per 10,000 yuan of GDP and 10,000 yuan of industrial added value has been significantly reduced, and the effective utilization coefficient of farmland irrigation water has been increased to above 0.55.
Cheng Xiaobing said that at present, the corresponding system for implementing the strictest water resources management system has been initially established. Under the guidance of the "No. 1 Document", the State Council has issued the "Opinions" and "Assessment Measures" respectively, and the Ministry of Water Resources has also issued the "Work Plan", Water consumption statistics methods, monitoring and metering management methods, and the implementation of the three red lines have also been formulated accordingly.
In addition, the financial guarantee, institutional guarantee, and monitoring and assessment system for the *strict water resources management system have also been implemented. Cheng Xiaobing specifically said that the "Central Funding Guarantee Plan for the Strict Water Resources Management System" has been formulated. At present, the collection and payment of the central government's share of water resource fees are going smoothly. Since 2010, it has been fully used for water resource conservation, protection and management at the national level; Beijing, Tianjin, Shanghai, three municipalities, Kunming, Nanchang and other 17 provincial capitals 74.56% of the administrative regions at or above the county level in the country have achieved integrated management of urban and rural water-related administrative affairs; the national water resources management system has also completed its preliminary work and is about to enter the stage of comprehensive construction. We will strive to build and improve a water resources management platform covering the central, river basin and provincial levels within three to five years, and provide technical support for the strictest water resources management system.
Copyright 2019 All Rights Reserved Hangzhou Jingda Electronics Co., Ltd. all rights reserved 浙ICP備11064465號 浙公安備33011002010018號
By:Doing